1、输送能力
1. Transport capacity
绿色平面pvc输送带的输送能力是指单位时间内输送的物料量。在输送散状物料时,以每小时输送物料的质量或体积计算;在输送成件物品时,以每小时输送的件数计算。
The conveying capacity of green plane PVC conveyor belt refers to the amount of material transported per unit time. When conveying bulk materials, it is calculated by the mass or volume of materials transported per hour; when conveying finished articles, it is calculated by the number of pieces transported per hour.
绿色平面pvc输送带
Green Flat PVC conveyor belt
2、输送长度和倾角
2. Conveying length and inclination
输送线路长度和倾角大小直接影响绿色平面pvc输送带的总阻力和所需要的功率。
The length and inclination of the conveying line directly affect the total resistance and the required power of the green plane PVC conveyor belt.
3、构件尺寸
3. Component size
绿色平面pvc输送带的构件尺寸包括pvc输送带宽度、板条宽度、料斗容积、管道直径和容器大小等。这些构件尺寸都直接影响pvc输送带的输送能力。
The component size of green plane PVC conveyor belt includes the width of PVC conveyor belt, width of strip, hopper volume, pipe diameter and container size. The dimensions of these components directly affect the conveying capacity of PVC conveyor belt.
4、输送速度
4. Conveying speed
提高输送速度可以提高输送能力。在以绿色平面pvc输送带作牵引件且输送长度较大时,输送速度日趋增大。但高速运转的带式输送带需注意振动、噪声和启动、制动等问题。对于以链条作为牵引件的pvc输送带,输送速度不宜过大,以防止增大动力载荷。同时进行工艺操作的普通输送带,输送速度应按生产工艺要求确定。
Increasing the conveying speed can improve the conveying capacity. When the green flat PVC conveyor belt is used as the traction part and the conveying length is large, the conveying speed is increasing. But the high-speed running belt needs to pay attention to the vibration, noise, starting and braking. For PVC conveyor belt with chain as traction part, the conveying speed should not be too high to prevent the increase of dynamic load. At the same time, the conveying speed of ordinary conveyor belt should be determined according to the production process requirements.