1. 刮板输送机的安装步骤如下:
1. The installation steps of scraper conveyor are as follows:
1)准备安装工具,清理安装现场,培训安装人员,确定刮板输送机头、渡槽、中渡槽、调整渡槽、连接槽、尾渡槽及尾部的安装位置,并做好标记。
1) prepare installation tools, clean the installation site, train the installation personnel, determine the installation positions of scraper conveyor head, aqueduct, middle aqueduct, adjustment aqueduct, connection aqueduct, tail aqueduct and tail, and make marks.
2)采用从机头到机尾顺序安装的方法,一个零件一个零件的安装。将机头底座置于规定位置,安装在机头上,与渡槽连接。
2) adopt the method of sequential installation from head to tail, one part one part installation. First, put the head base at the specified position, install it on the head, and connect with the aqueduct.
3)将刮板链穿过渡槽与鼻部底链槽的鼻部空间,置于鼻部链轮上。所连接的刮板链斜置于机器通道上,刚好处于开底溜槽的空间位置,以便在底链逐步拧紧时进入底链通道。
3) put the scraper chain through the nose space of the transition groove and the bottom chain groove of the nose, and place it on the nose sprocket. The connected scraper chain is inclined on the machine channel, just in the space position of the bottom chute, so as to enter the bottom chain channel when the bottom chain is tightened gradually.
4)将斜槽分段安装在导水管通过处,将底链分段紧固,进入底链通道;如果是底盖溜槽,在安装溜槽时,刮板链应逐步通过底链槽,直尾部到达渡槽。
4) install the chute section at the passage of the water guide pipe, fasten the bottom chain section, and enter the bottom chain passage; if it is the bottom cover chute, the scraper chain shall gradually pass through the bottom chain passage until the end reaches the aqueduct.
5)将尾座置于规定位置,将底链穿过尾座的底链槽穿过渡槽,将尾座安装在渡槽上;经过链通道底部的尾巴,尾巴安装部分,绕过尾轮,拉链式的长链到飞机,结束与刮板链链轮的飞机,并形成一个封闭的连续刮板链。
5) place the tailstock at the specified position, pass the bottom chain through the bottom chain slot of the tailstock through the transition slot, and install the tailstock on the aqueduct; pass through the tail at the bottom of the chain channel, the tail installation part, bypass the tail wheel, the zipper type long chain to the aircraft, and end the aircraft with the scraper chain sprocket, and form a closed continuous scraper chain.
6)在溜槽支架上安装“T”形螺栓,从机头到机尾安装挡煤板、铲煤板、牵引导轨等附件。
6) install the "t" bolt on the chute bracket, and install the coal baffle, coal shovel plate, traction guide rail and other accessories from the head to the tail.
7)依次安装头部锚固装置、渡槽、中间槽锚固装置、尾部锚固装置。
7) install the head anchorage device, aqueduct, intermediate trough anchorage device and tail anchorage device in turn.
8)敷设电缆、乳化油管、水管、通讯、照明、控制管线系统。
8) lay cables, emulsified oil pipes, water pipes, communication, lighting and control pipeline systems.
9)对减速机、液力耦合器、链轮油腔按规定的油质和油量加油。
9) oil the reducer, hydraulic coupling and sprocket oil cavity according to the specified oil quality and quantity.
10)检查安装质量,链轨杂物,试运转前进行调整。
10) check the installation quality, remove the sundries from the chain rail, and adjust before the test run.